MENU

Easterseals Headstart Facility

2023   I   Completed

LOCATION

Washington, D.C.

Discipline

SECTOR

Project Type

Img 04_Gallery_Easterseals View 2
Img 04_Gallery_Easterseals View 3
Img 04_Gallery_Easterseals View 6
Img 04_Gallery_Easterseals View 2
Img 04_Gallery_Easterseals View 3
Img 04_Gallery_Easterseals View 6
previous arrow
next arrow

Project Details

In 2023, Easterseals, in partnership with MOYA Design Partners, completed the interior fit-out of a new Head Start Facility at 1151 Bladensburg Road Northeast, Washington, DC. This 8,344-square-foot project, costing $2.7 million, is dedicated to meeting the needs of children with disabilities and their caregivers, addressing a vital gap in high-quality childcare in the area.

The design emphasizes a warm, engaging, and accessible environment that promotes inclusivity and independence. MOYA transformed the previously cold, dark first floor into a vibrant community space. The layout, inspired by a child’s perspective, features playful yet functional design elements that encourage family involvement.

Bright colors and strategic spatial planning create distinct, inviting areas, making navigation easy for children. The children’s rooms incorporate lively accents that contrast with calming flooring, fostering both stimulation and comfort. This fit-out aligns with Easterseals’ mission to empower children with disabilities, enhancing their independence and inclusion within the community.

Facts & Figures

Client

Easterseals DC MD VA

Size

8,344 SF 

Status

Completed

Completion Year

2023

project cost

$2.7M

Delivery Method

DesignBidBuild 

Construction type

Interior Fit-Out 

Collaborators

CIVIL

A. Morton Thomas and Associates, Inc. (AMT)

STRUCTURAL

Ehlert Bryan

MEP

Omega Engineering, LLC

More Projects

Moya Design Partners, LLC. © 2025, All Rights Reserved

MOYA Design Partners, LLC. © 2025, All Rights Reserved